1908 W 22ND PL

INSTALL TWO MAIN SERVICE 100AMP DISCONNECT SWITCHES AS THE DISTANCE FROM THE POINT OF PENETRATION AFTER THE METERS INTO THE BUILDING IS GREATER THAN 5¿ WHICH IS REQUIRED BY CODE. - CONTINUE THE POWER SUPPLY RACEWAYS AFTER THE TWO DISCONNECT SWITCHES TO THE APARTMENT ELECTRICAL PANELS LOCATED IN THE BASEMENT COMMON AREA. - INSTALLATION OF POWER SUPPLY FROM THE METER BANK LOCATION TO THE PUBLIC/COMMON AREA PANEL WILL NOT REQUIRE A FORM OF DISCONNECT AS THE ELECTRICAL PANEL IS LOCATED WITHIN THE REQUIRED 5¿ OF PENETRATION. - INSTALL ¾¿ EMT CONDUIT FROM THE MAIN ELECTRICAL SERVICE TO THE MAIN WATER METER WITH #4AWG COPPER WIRE AND BOND FOR MAIN GROUNDING PURPOSES. - CLEAN UP ALL OF THE FLEXIBLE METALLIC WHIPS AT THE ELECTRICAL PANELS AS REQUIRED PER ELECTRICAL CODE. - INSTALL 1X OWNER PROVIDED LIGHT FIXTURE IN THE BASEMENT TO BE CONTROLLED BY A 3-WAY SWITCHING SYSTEM.

Permit

Permit type
PERMIT – EXPRESS PERMIT PROGRAM
Class
Unknown
Trade
Electrical
Nature of work
Other
Work
Electrical Work
Status
COMPLETE

Location

City
Chicago
State
IL

Dates

Applied
2023-09-19
Issued
2023-09-19
Time to issue
same day

Chicago details

Review type
EXPRESS PERMIT PROGRAM
Milestone
COMPLETE
Community area (code)
31

Data as of 2026-09-21.