Chicago · permit B100838562
200 E PEARSON ST
ELECTRICAL REQUIREMENTS FOR REPLACEMENT BOILER EQUIPMENT A) F&I REQUIRED NEW CIRCUIT BREAKERS INTO EXISTING PANEL FOR REPLACEMENT EQUIPMENT POWER. B) REQUIRED CONDUIT, WIRING AND CONNECTIONS FROM EXISTING BREAKER PANEL TO NEW EQUIPMENT, INCLUDING LOCAL DISCONNECT SWITCH OR RECEPTACLE WHERE REQUIRED. > BOILER BURNER PACKAGE. (120V, 30A) (LOCAL DISCONNECT) > FEED WATER/VACUUM PUMP PACKAGE. (208V, 3-PHASE, 20A) (LOCAL DISCONNECT) > HEAT TIMER CONTROL PANEL. (120V, 15A) (LOCAL DISCONNECT) > E-STOP BUTTON LOCATED OUTSIDE BOILER ROOM, CONNECT TO HEAT TIMER CONTROL PANEL. > WATER SOFTENER SYSTEM (120V, 15A) (RECEPTACLE) > WATER TREATMENT METERING PUMP & CONTROLLER. (120V, 15A) (RECEPTACLE) > FRESH AIR INTAKE FAN & DAMPER (208V, 3-PHASE, 20A) (LOCAL DISCONNECT) > NEW WATER HEATER (120V, 15A) (LOCAL DISCONNECT) > REPLACE (4) EXISTING 4FT FLUORESCENT FIXTURES WITH (4) 4FT LED WRAP AROUND TYPE FIXTURES, CONNECT TO EXISTING CIRCUIT.
Permit
- Permit type
- PERMIT – EXPRESS PERMIT PROGRAM
- Class
- Unknown
- Trade
- Electrical
- Nature of work
- Other
- Work
- Electrical Work
- Status
- COMPLETE
Location
- City
- Chicago
- State
- IL
Dates
- Applied
- 2019-08-29
- Issued
- 2019-08-29
- Time to issue
- same day
Value and contractor
- Declared value
- Log in with your free account
- Total fee
- Log in with your free account
- Contractor
- MKD ELECTRIC, INC.
Chicago details
- Review type
- EXPRESS PERMIT PROGRAM
- Milestone
- COMPLETE
- Community area (code)
- 8