Preview 947,032 permits — every permit Chicago, Austin and Seattle issued in the last ten years. The full load is in progress, so this is how far it has got. Sourced from city open-data portals. Data as of 2026-09-21.

Chicago · permit 100963245

4443 W CHICAGO AVE

*DIRECT DEVELOPER SERVICES* PBC- 04000-02. THE JOINT PUBLIC SAFETY TRAINING CAMPUS. PHASE II IS A SIMULATED VILLAGE CONSISTING OF 5-6 DIFFERENT ZONES. WITHIN THESE ZONES ARE TRAINING STRUCTURES BUILT TO SIMULATE REAL WORLD CONDITIONS THAT LIFE SAFETY PERSONNEL CAN UTILIZE FOR TRAINING PURPOSES. THE STRUCTURES ARE BUILT TO BE UNOCCUPIED, THERE WILL BE NO GAS SERVICE OR LIGHTING/HEATING AND WATER WILL BE MINIMAL. THE WORK CONTAINED IN THIS PERMIT SUBMITTAL INCLUDES THE TWO FIRE DEPARTMENT LIVE FIRE TRAINING BLOCKS (ZONE C AND ZONE D), AND THE POLICE DEPARTMENT 'URBAN SEARCH AND RESCUE TRAINING" BLOCK (ZONE E) INCORPORATING 3 STRUCTURES (2 MULTI-USE, 1 OUTDOOR STRUCTURE), BUILT TO SIMULATE CHICAGO MIX-USED BUILDINGS AND DIFFERENT URBAN SCENARIOS AS PER PLANS.CONSULTANT REVIEWER: PRIMERA ENGINEERING

Permit

Permit type
PERMIT - NEW CONSTRUCTION
Class
Unknown
Trade
Electrical
Nature of work
New
Status
COMPLETE

Location

City
Chicago
State
IL

Dates

Applied
2022-05-17
Issued
2022-10-17
Time to issue
153 days

Chicago details

Review type
DIRECT DEVELOPER SERVICES
Milestone
CERTIFICATE OF OCCUPANCY ISSUED
Community area (code)
23

Data as of 2026-09-20.

Other permits issued in Chicago, October 2022