Austin · permit 2017-101376 BP

13309 MERIDIAN PARK BLVD

New SFR - 2-story; 6 bed; 4.0 bath; covered porch; covered patio; attached 3-car garage. 3/13/18 DD Site Inspection for compliance with tree Permit issued Failed. No Tree Protection fence or mulch per ECM 3.5.2 specs has been installed. 20 (triple stem) Live Oak in the front yard 26 Live Oak near right front corner of house and property line 20 Live Oak at right rear corner of house and property line. Tree protection and mulch for the full CRZ is required at all times during construction. Construction materials and construction activity is impacting the tree root zone. A one time root remediation is required for the full CRZ of all three trees. Remediation is to include soil decompacttion with an air spade incorporate 1 thick layer of organic compost and mulch the 1/2 CRZ with 2 layer of shreaded wood mulch. A deep root hydraulic fertilizer application is required for the Full CRZ of all three trees. All dead and broken branches on these three trees are to be pruned. All Tree work to be preformed by a I.S.A. Certified Arborist. Receipts are required for all work prior to Final Tree Inspection.

Permit

Permit type
Building Permit
Class
Residential
Trade
General/Building
Nature of work
New
Work
New
Status
Final

Location

City
AUSTIN
State
TX
ZIP
78652

Dates

Applied
2017-04-17
Issued
2017-08-31
Expires
2018-06-25
Completed
2018-06-25
Time to issue
136 days

Value and contractor

Declared value
Log in with your free account
Total fee
N/A. Total fee is a premium field which requires a paid plan. However, this permit has no fee on record.
Contractor
Willis, Chappell, and Bujan Custom Builders

Austin details

Project ID
11773567
Status date
2018-06-25
Floors
2
Certificate of occupancy
Yes
Permit class (Austin detail)
R- 101 Single Family Houses

Data as of 2026-09-20. View the city's record