GTO INSTALLERS CORP
Chicago, IL
2
Permits on record
1
Addresses
2
Permit types
Permits issued between 2021-05-11 and 2023-02-28.
Chicago, IL
Permits issued between 2021-05-11 and 2023-02-28.
Too few permits on record (2) to say anything about how long the city takes for this contractor. A timing figure needs at least 5 permits of the same type before it means anything.
| Value | permits | Share |
|---|---|---|
| Electrical | 1 | 50.0% |
| General/Building | 1 | 50.0% |
| Value | permits | Share |
|---|---|---|
| Alteration | 1 | 50.0% |
| Other | 1 | 50.0% |
1 address. Most recently permitted first.
Every permit above is published by the City of Chicago in its open-data portal. 1,117,532 permits — every permit Chicago, Austin and Seattle issued in the last ten years.
This is included with your free account.
One step: the same page signs you in or creates the account, then brings you straight back here.