Vaughan Construction
Austin, TX
12
Permits on record
1
Addresses
4
Permit types
Permits issued between 2022-07-08 and 2022-11-17.
Austin, TX
Permits issued between 2022-07-08 and 2022-11-17.
Days from application to issue, by permit type, with the city's own median for the same type beside it. This measures the permit office as much as the contractor.
| Permit type | Permits | Median days | Austin median | Slowest 10% |
|---|---|---|---|---|
| Building Permit | 9 | 55 | 32 | 71 |
| Value | permits | Share |
|---|---|---|
| General/Building | 9 | 75.0% |
| Electrical | 1 | 8.3% |
| Mechanical | 1 | 8.3% |
| Plumbing | 1 | 8.3% |
| Value | permits | Share |
|---|---|---|
| Alteration | 11 | 91.7% |
| Demolition | 1 | 8.3% |
| Value | permits | Share |
|---|---|---|
| Final | 11 | 91.7% |
| VOID | 1 | 8.3% |
1 address. Most recently permitted first.
Every permit above is published by the City of Austin in its open-data portal. 1,117,549 permits — every permit Chicago, Austin and Seattle issued in the last ten years.
This is included with your free account.
One step: the same page signs you in or creates the account, then brings you straight back here.