VALUE SOLAR POWER
Austin, TX
25
Permits on record
19
Addresses
1
Permit types
Permits issued between 2018-02-22 and 2021-06-17.
Austin, TX
Permits issued between 2018-02-22 and 2021-06-17.
Days from application to issue, by permit type, with the city's own median for the same type beside it. This measures the permit office as much as the contractor.
| Permit type | Permits | Median days | Austin median | Slowest 10% |
|---|---|---|---|---|
| Electrical Permit | 25 | 2 | 17 | 111 |
| Value | permits | Share |
|---|---|---|
| Other | 20 | 80.0% |
| Repair | 3 | 12.0% |
| New | 2 | 8.0% |
| Value | permits | Share |
|---|---|---|
| Final | 21 | 84.0% |
| Expired | 4 | 16.0% |
19 addresses. Most recently permitted first.
Every permit above is published by the City of Austin in its open-data portal. 1,117,986 permits — every permit Chicago, Austin and Seattle issued in the last ten years.
This is included with your free account.
One step: the same page signs you in or creates the account, then brings you straight back here.