Trinity Constructors
Austin, TX
99
Permits on record
77
Addresses
4
Permit types
Permits issued between 2016-10-19 and 2026-05-05.
Austin, TX
Permits issued between 2016-10-19 and 2026-05-05.
Days from application to issue, by permit type, with the city's own median for the same type beside it. This measures the permit office as much as the contractor.
| Permit type | Permits | Median days | Austin median | Slowest 10% |
|---|---|---|---|---|
| Building Permit | 94 | 82 | 32 | 273 |
| Value | permits | Share |
|---|---|---|
| General/Building | 94 | 94.9% |
| Plumbing | 2 | 2.0% |
| Mechanical | 2 | 2.0% |
| Electrical | 1 | 1.0% |
| Value | permits | Share |
|---|---|---|
| Alteration | 69 | 69.7% |
| Demolition | 13 | 13.1% |
| New | 11 | 11.1% |
| Addition | 5 | 5.1% |
| Other | 1 | 1.0% |
| Value | permits | Share |
|---|---|---|
| Final | 80 | 80.8% |
| Active | 9 | 9.1% |
| Expired | 8 | 8.1% |
| Withdrawn | 2 | 2.0% |
49–72 of 77 addresses. Most recently permitted first.
Every permit above is published by the City of Austin in its open-data portal. 1,117,532 permits — every permit Chicago, Austin and Seattle issued in the last ten years.
This is included with your free account.
One step: the same page signs you in or creates the account, then brings you straight back here.