MAG Construction Management LLC
Austin, TX
73
Permits on record
25
Addresses
5
Permit types
Permits issued between 2020-04-03 and 2025-12-23.
Austin, TX
Permits issued between 2020-04-03 and 2025-12-23.
Days from application to issue, by permit type, with the city's own median for the same type beside it. This measures the permit office as much as the contractor.
| Permit type | Permits | Median days | Austin median | Slowest 10% |
|---|---|---|---|---|
| Driveway / Sidewalks | 11 | 452 | 161 | 737 |
| Building Permit | 56 | 53 | 32 | 185 |
| Value | permits | Share |
|---|---|---|
| General/Building | 56 | 76.7% |
| Other | 11 | 15.1% |
| Electrical | 2 | 2.7% |
| Mechanical | 2 | 2.7% |
| Plumbing | 2 | 2.7% |
| Value | permits | Share |
|---|---|---|
| New | 46 | 63.0% |
| Demolition | 21 | 28.8% |
| Addition | 6 | 8.2% |
| Value | permits | Share |
|---|---|---|
| Final | 70 | 95.9% |
| Expired | 2 | 2.7% |
| Withdrawn | 1 | 1.4% |
1–24 of 25 addresses. Most recently permitted first.
Every permit above is published by the City of Austin in its open-data portal. 1,117,549 permits — every permit Chicago, Austin and Seattle issued in the last ten years.
This is included with your free account.
One step: the same page signs you in or creates the account, then brings you straight back here.