Madera Custom Homes
Austin, TX
35
Permits on record
19
Addresses
3
Permit types
Permits issued between 2019-06-05 and 2026-05-26.
Austin, TX
Permits issued between 2019-06-05 and 2026-05-26.
Days from application to issue, by permit type, with the city's own median for the same type beside it. This measures the permit office as much as the contractor.
| Permit type | Permits | Median days | Austin median | Slowest 10% |
|---|---|---|---|---|
| Driveway / Sidewalks | 5 | 587 | 161 | 1175 |
| Plumbing Permit | 3 | 116 | 30 | 470 |
| Building Permit | 27 | 98 | 32 | 350 |
| Value | permits | Share |
|---|---|---|
| General/Building | 27 | 77.1% |
| Other | 5 | 14.3% |
| Plumbing | 3 | 8.6% |
| Value | permits | Share |
|---|---|---|
| New | 19 | 54.3% |
| Addition | 12 | 34.3% |
| Repair | 2 | 5.7% |
| Demolition | 1 | 2.9% |
| Alteration | 1 | 2.9% |
| Value | permits | Share |
|---|---|---|
| Final | 32 | 91.4% |
| Active | 2 | 5.7% |
| Expired | 1 | 2.9% |
19 addresses. Most recently permitted first.
Every permit above is published by the City of Austin in its open-data portal. 1,117,549 permits — every permit Chicago, Austin and Seattle issued in the last ten years.
This is included with your free account.
One step: the same page signs you in or creates the account, then brings you straight back here.