Fit Build Construction

Austin, TX

15 Permits on record
13 Addresses
2 Permit types

Permits issued between 2020-01-09 and 2026-08-12.

How long the city took

Days from application to issue, by permit type, with the city's own median for the same type beside it. This measures the permit office as much as the contractor.

Permit typePermitsMedian daysAustin medianSlowest 10%
Building Permit1450 3298

What they pull permits for

Trades

ValuepermitsShare
General/Building 14
Other 1

Nature of work

ValuepermitsShare
Addition 9
Repair 5
New 1

Where they stand

ValuepermitsShare
Final 11
Expired 3
Active 1

Where they have worked

13 addresses. Most recently permitted first.

Every permit above is published by the City of Austin in its open-data portal. 1,117,532 permits — every permit Chicago, Austin and Seattle issued in the last ten years.