DPR Construction Marriott
Austin, TX
54
Permits on record
35
Addresses
2
Permit types
Permits issued between 2018-07-02 and 2020-05-26.
Austin, TX
Permits issued between 2018-07-02 and 2020-05-26.
Days from application to issue, by permit type, with the city's own median for the same type beside it. This measures the permit office as much as the contractor.
| Permit type | Permits | Median days | Austin median | Slowest 10% |
|---|---|---|---|---|
| Building Permit | 53 | 423 | 32 | 899 |
| Value | permits | Share |
|---|---|---|
| General/Building | 53 | 98.1% |
| Other | 1 | 1.9% |
| Value | permits | Share |
|---|---|---|
| Alteration | 52 | 96.3% |
| New | 2 | 3.7% |
1–24 of 35 addresses. Most recently permitted first.
Every permit above is published by the City of Austin in its open-data portal. 1,117,549 permits — every permit Chicago, Austin and Seattle issued in the last ten years.
This is included with your free account.
One step: the same page signs you in or creates the account, then brings you straight back here.