Davis Electric
Austin, TX
42
Permits on record
41
Addresses
2
Permit types
Permits issued between 2018-12-26 and 2026-08-25.
Austin, TX
Permits issued between 2018-12-26 and 2026-08-25.
Days from application to issue, by permit type, with the city's own median for the same type beside it. This measures the permit office as much as the contractor.
| Permit type | Permits | Median days | Austin median | Slowest 10% |
|---|---|---|---|---|
| Electrical Permit | 41 | 5 | 17 | 36 |
| Value | permits | Share |
|---|---|---|
| Electrical | 41 | 97.6% |
| General/Building | 1 | 2.4% |
| Value | permits | Share |
|---|---|---|
| Repair | 33 | 78.6% |
| Alteration | 6 | 14.3% |
| Addition | 2 | 4.8% |
| Other | 1 | 2.4% |
| Value | permits | Share |
|---|---|---|
| Final | 28 | 66.7% |
| Expired | 10 | 23.8% |
| Active | 4 | 9.5% |
1–24 of 41 addresses. Most recently permitted first.
Every permit above is published by the City of Austin in its open-data portal. 1,117,986 permits — every permit Chicago, Austin and Seattle issued in the last ten years.
This is included with your free account.
One step: the same page signs you in or creates the account, then brings you straight back here.