Camp Construction
Austin, TX
49
Permits on record
46
Addresses
1
Permit types
Permits issued between 2021-06-01 and 2024-09-05.
Austin, TX
Permits issued between 2021-06-01 and 2024-09-05.
Days from application to issue, by permit type, with the city's own median for the same type beside it. This measures the permit office as much as the contractor.
| Permit type | Permits | Median days | Austin median | Slowest 10% |
|---|---|---|---|---|
| Building Permit | 49 | 1 | 32 | 1177 |
| Value | permits | Share |
|---|---|---|
| Repair | 38 | 77.6% |
| Alteration | 10 | 20.4% |
| Demolition | 1 | 2.0% |
| Value | permits | Share |
|---|---|---|
| Expired | 47 | 95.9% |
| Final | 2 | 4.1% |
1–24 of 46 addresses. Most recently permitted first.
Every permit above is published by the City of Austin in its open-data portal. 1,117,986 permits — every permit Chicago, Austin and Seattle issued in the last ten years.
This is included with your free account.
One step: the same page signs you in or creates the account, then brings you straight back here.