Every permit type in Seattle
4 kinds of permit appear on the 3,009 Seattle permits we hold, as of 2026-09-09. 3 of them have enough measurable permits to say how long the city takes. Open a type to see the permits themselves.
| Permit type | Permits held | Share of what we hold | Typical | 9 in 10 within | Measured |
|---|---|---|---|---|---|
| Building | 2,535 | 84.2% | 55 days | 262 days | 2,533 |
| Roof | 244 | 8.1% | too few measured to time | ||
| Demolition | 217 | 7.2% | 81 days | 418 days | 217 |
| Grading | 13 | 0.4% | 97 days | 311 days | 13 |
“Permits held” counts what PermitWatch holds for Seattle — the most recently issued permits, not the city’s whole history — so it describes this corpus and not the city’s output. 1 type has fewer than eight permits carrying both an application and an issue date, so it is left untimed rather than given a median over a handful of permits.
What these names mean
Permit types are the city’s own classification, printed here exactly as Seattle publishes them — including its prefixes and its spelling. Two cities describing the same job will use different words for it, which is why this page is per city.
Preview: 9,183 permits loaded from Chicago, Austin and Seattle. More cities are being added.