Every permit type in Austin
5 kinds of permit appear on the 3,079 Austin permits we hold, as of 2026-09-09. 5 of them have enough measurable permits to say how long the city takes. Open a type to see the permits themselves.
| Permit type | Permits held | Share of what we hold | Typical | 9 in 10 within | Measured |
|---|---|---|---|---|---|
| Electrical Permit | 982 | 31.9% | 15 days | 272 days | 982 |
| Plumbing Permit | 779 | 25.3% | 28 days | 448 days | 776 |
| Mechanical Permit | 630 | 20.5% | 9 days | 222 days | 629 |
| Building Permit | 579 | 18.8% | 32 days | 180 days | 577 |
| Driveway / Sidewalks | 109 | 3.5% | 103 days | 512 days | 108 |
“Permits held” counts what PermitWatch holds for Austin — the most recently issued permits, not the city’s whole history — so it describes this corpus and not the city’s output.
What these names mean
Permit types are the city’s own classification, printed here exactly as Austin publishes them — including its prefixes and its spelling. Two cities describing the same job will use different words for it, which is why this page is per city.