8 permits on record, mostly other work — general/building.
-
2026-09-16
Install minor communication "small cell node" utility pole (Verizon) per plan.
-
2026-03-31
Installation of temporary canopy over the Mural Amphitheater stage for periodic outdoor events on Seattle Center campus. Installation date will be 5/14/2026 and removal will be 9/16/2026 per plan
-
2025-12-20
Addition/Alteration — Building
Replace existing light pole with new light pole to include integrated small wireless antennas and equipment for minor telecommunications facility [VERIZON] on institutional campus [SEATTLE CENTER] per plan.
-
2025-12-16
Addition/Alteration — Building
Construct new light pole with telecommunication antennae south of the Armory per plan.
-
2025-04-17
Installation of temporary canopy over the Mural Amphitheater stage for periodic outdoor events on Seattle Center campus. Installation date will be [Insert Date Here] and removal will be [Insert Date Here] per plan
-
2024-04-30
Installation of temporary canopy over the Mural Amphitheater stage for periodic outdoor events on Seattle Center campus. Installation date will be 5/15/2024 and removal will be 9/11/2024 per plan.
-
2023-05-05
Install temporary canopy cover over existing mural amphitheater stage. Installation will be on 5/17 and it remain in place until after Labor Day 9/14/2023 for periodic outdoor events at Seattle Center per plan.
-
2022-09-12
Install temporary supports for cover over existing mural amphitheater stage. Installation will be on 5/16 and it remain in place until just after Labor Day 9/5/2022 for periodic outdoor events at Seattle Center per plan.