1301 SPRING ST
SEATTLE, WA 98104
15 permits on record, mostly alteration work — general/building.
Work here was permitted by STS Construction.
-
2026-04-16
Addition/Alteration — Building
Interior remodel to condominium of existing multifamily building Subject To Field Inspection (STFI)
-
2025-07-29
Addition/Alteration — Building
Interior alterations to add a wall to separate two existing units (6D 6E) in the First Hill Plaza Condo subject to field inspection.
-
2023-10-31
Addition/Alteration — Building
Construct alterations to existing building and site improvements per plan.
-
2023-08-30
Addition/Alteration — Building
Construct non-structural alterations to condominium unit #20i of existing multi-family building subject-to-field inspection (STFI)
-
2021-10-18
Addition/Alteration — Building
Construct alterations to convert enclosed unheated sunroom to conditioned space within existing multifamily building (Unit 241) per plan.
-
2021-08-11
Addition/Alteration — Building
Construct interior alterations to two bathrooms in multifamily structure subject to field inspection (STFI).
-
2021-08-10
Addition/Alteration — Building
Interior alterations to unit 241 subject to field inspection STFI.
-
2021-06-01
Addition/Alteration — Building
Alterations to existing multifamily building to enclose a balcony for Unit 5E per plan.
-
2021-02-19
Addition/Alteration — Building
Construct exterior repairs and alterations to condominium building at the plaza and floor 33 level per plan.
-
2021-01-12
Addition/Alteration — Building
Interior renovation of Apt 5E in First Hill Plaza condominium building subject to field inspection STFI.
-
2020-11-10
Addition/Alteration — Building
Construct alterations in a residential high-rise to enclose a balcony for unit #11D per plan
-
2020-05-06
Addition/Alteration — Building
Construct alterations to condo on level 28 of existing multi-family structure subject to field inspection (STFI).
Declared value Log in with your free accountContractor STS ConstructionStatus ExpiredPermit 6780443-CN -
2019-12-27
Addition/Alteration — Building
Remodel condo unit 4A subject to field inspection (STFI).
-
2019-08-06
Addition/Alteration — Building
Interior alterations of Unit 21G of First Hill Plaza Condominium subject to field inspection
-
2017-04-03
Addition/Alteration — Building
Interior alterations to existing condo unit #19G (through out unit) subject to field inspection