Chicago
1410 S MUSEUM CAMPUS DR
-
2026-09-04
PERMIT - NEW CONSTRUCTION
PERMIT EXPIRES ON 11/04/2026 ERECTION STARTS: 9/20/2026, ERECTION ENDS: 9/20/2026. CBC 2019. REINSTATEMENT OF 2024 PERMIT 101058268 FOR THE SEPT 20, 2026 MOBILE STAGE FOR THE CHICAGO BEARS AT STADIUM GREEN ON SEPT 20, 2026. SET-UP SEPT 20 AND TAKEDOWN SEPT 20, 2026. SAME 1 - 24X20 SL100 WITH WINGS. FROST CHICAGO LIGHTING CO. WITH SOUND WORKS PRODUCTION INC.
-
2026-09-02
PERMIT - NEW CONSTRUCTION
PERMIT EXPIRES ON 11/02/2026 ERECTION STARTS: 8/31/2026, ERECTION ENDS: 9/4/2026. SELF-CERT - CBC 2019 - PEER REVIEW. ERECTION OF TEMPORARY STAGE FOR A YE CONCERT AT SOLDIER FIELD, EVENT DATES SEPTEMBER 3RD-4TH, 2026 OVERALL AREA: 9,486 SQ.FT., INCLUDING:1.) CIRCULUR HALF DOME MAIN STAGE: 7,854 SF2.) BAND RISER: 24FT X 36FT X 36IN=864 SF3.) AUDIO SCAFFOLD SUPPORTS: 8FT X 8FT X 6FT= 64SF X 12 = 768 SF
-
2026-08-27
PERMIT - NEW CONSTRUCTION
PERMIT EXPIRES ON 10/27/2026 ERECTION STARTS: 9/17/2026, ERECTION ENDS: 9/18/2026. CBC 2019. AHA HEART WALK 2026 MOBILE STAGE AT SOLDIER FIELD SOUTH LOT ON SEPT 18, 2026. SETUP SEPT 17 AND TAKEDOWN SEPT 18, 2026. 1-24X20 MOBILE STAGE. RAVENSWOOD EVENTS WITH HRP CHICAGO.
-
2026-08-25
PERMIT - NEW CONSTRUCTION
PERMIT EXPIRES ON 10/25/2026 ERECTION STARTS: 8/23/2026, ERECTION ENDS: 8/30/2026. ERECTION STARTS: 8/23/2026, ERECTION ENDS: 8/30/2026. ARENA- BTS WORLD TOUR - SOLDIER FIELDTENT- 2 DAY EVENT, AUGUST 27-28, 2026ERECT ONE (1) 41.25X230 (12.5MX70M) STRUCTURE TENTSETUP 8/23/2026- REMOVE 8/30/2026ASSEMBLY
-
2026-08-20
PERMIT - NEW CONSTRUCTION
PERMIT EXPIRES ON 10/20/2026 ERECTION STARTS: 8/23/2026, ERECTION ENDS: 8/29/2026. SELF-CERT - CBC 2019 - PEER REVIEW. ERECTION OF TEMPORARY STAGE FOR A BTS CONCERT AT SOLDIER FIELD, EVENT DATES AUGUST 27TH & 28TH, 2026 OVERALL AREA: 21,130 SQ.FT., INCLUDING:1.) CIRCULAR MAIN STAGE: 10,482 SF2.) RUNWAY STAGE: 2,662 SF X 4= 10,648 SF
-
2026-08-19
PERMIT - NEW CONSTRUCTION
PERMIT EXPIRES ON 10/18/2026 ERECTION STARTS: 8/17/2026, ERECTION ENDS: 8/23/2026. SELF-CERT - CBC 2019 - PEER REVIEW. ERECTION OF TEMPORARY STAGE FOR THE R&B TOUR CONCERT AT SOLDIER FIELD, EVENT DATES AUGUST 21ST & 22ND, 2026 OVERALL AREA: 26,465 SQ.FT., INCLUDING:1.) MAIN STAGE: 11,800 SF2.) ARM STAGE: 1,348 X 2 =2,696 SF3.) T-SHAPED THRUST STAGE: 1,477 SF4.) ARROW SHAPED B-STAGE: 1,376 SF5.) DJ DELAY STAGE: 1,060 X 2 = 2,120 SF6.) VIP STAGE: 4,244 SF7.) FRONT OF HOUSE (FOH) MIX HUT: 24FT X 24FT = 576 X 2 = 1,152SF8.) 60FT TALL DELAY TOWERS: 20FT X 20FT = 400 X 4 = 1,600 SF
-
2026-08-19
PERMIT - REINSTATE REVOKED PMT
REINSTATE PERMIT NO 101071977 MUST BEGIN WORK AND OR REQUEST INSPECTION NO LATER THAN ***DECEMBER 2026*** ON PERMIT NO 101071977
Contractor CAPO CONSTRUCTION LLCPermit 101087467 -
2026-08-14
PERMIT - NEW CONSTRUCTION
PERMIT EXPIRES ON 10/14/2026 ERECTION STARTS: 8/30/2026, ERECTION ENDS: 8/30/2026. CBC 2019 - 2026 BLACK ON THE BLOCK STAGE AT STADIUM GREEN ON AUG 30, 2026. SETUP AND TAKEDOWN ARE AUG 30. 1-24X20 SL-100 MOBILE STAGE WITH WINGS. SOUND WORKS PRODUCTION INC.
-
2026-08-10
Monthly Maintenance Permit — PERMIT – EXPRESS PERMIT PROGRAM
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 8/17/2026. END DATE: 9/16/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
-
2026-08-10
Monthly Maintenance Permit — PERMIT – EXPRESS PERMIT PROGRAM
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 8/24/2026. END DATE: 9/23/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
-
2026-08-10
Monthly Maintenance Permit — PERMIT – EXPRESS PERMIT PROGRAM
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 8/31/2026. END DATE: 9/30/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.